Removal and installation
− Before starting to remove parts, carry out the following operations:
- A) Remove the engine crankcase guard.
- b) Remove a reception pipe of system of release.
− Removal of parts is carried out in the order of numbers indicated in the figure "Removal of the central longitudinal beam and supports of the power unit".
− Installation of parts is carried out in the reverse order of removal.
− When installing the parts, pay attention to the installation procedure of the front support of the power unit.
Install the front support so that the hole on the powertrain support bracket is facing the front of the vehicle.
− After completing the installation of parts, perform the following operations:
- A) Install the exhaust pipe.
- b) Install the engine crankcase guard.
Examination
1. Check the power unit mounts for cracks, delamination, and deformation.
2. Check up the central longitudinal beam on absence of cracks and deformation.
Removal of the central longitudinal beam and supports of the power unit. 1 - front support connecting bolt, 2 - central longitudinal beam and front support assembly, 3 - power unit front support, 4 - rear support connecting bolt, 5 - power unit support bracket, 6 - power unit rear support.
Attention: the fastening elements are marked with the symbol, which should first be pre-tightened, and the final tightening should be done after the engine is completely lowered onto the supports with the vehicle horizontal.