1. Spring support; 2. Spring holder; 3. Bracket; 4. Pipe connection; 5. Valve dosing TJ depending on the mass (LSPV); 6. Bracket; 7. Brake bleed valve
Removal is carried out in the order shown in the figure.
Installation is in the reverse order. After installation, it is necessary to fill the TJ brake system and bleed air, as well as check and adjust the length of the mass sensor spring (see maintenance chapter).